Commit graph

2 commits

Author SHA1 Message Date
lane-b6
db3909bcd4 docs: B6 measured -- prediction held, closed 0 regressed 0 on both reference pairs
209 -> 158 (closed 51, regressed 0) and 108 -> 87 (closed 21, regressed 0), identical to the
pre-lane baseline, measured on CT111. Falsification hypotheses 1 and 2 refuted by measurement
(three empty BQ frames per reference save, every hbq false, the one command block empty);
hypothesis 3 refuted by the corpus oracle; hypothesis 4 stands as a labelled hypothesis.

construction.h also carries the ship/fleet birth shape as read but NOT implemented, with the
reason stated: the newborn hull copies four cached stat words the engine does not yet compute.
2026-09-08 14:54:21 -04:00
lane-b6
9f8d75d9cb docs: B6 prediction before the build -- the build queue closes nothing on either reference pair
Written before any code (earned rule 2). Both reference saves carry three BQ frames with
zero orders, every hbq false and the only TurnCommands_v5 block empty, so the pass has
nothing to advance; the archived destroyer is created inside the turn by the AI. Includes
the falsification list and names the oracle pair the campaign already owns.
2026-09-08 14:33:16 -04:00