Thin-plate-spline fit of the forester's 2022 map to the parcel, trails traced and checked against the 2023 0.25 ft ortho and 2 ft lidar; crossings snapped to DEM-derived channels. GeoJSON in WGS84 and EPSG:6433, overlay images, method notes, and a payload/push script for the viewer's plan layer.
5.9 KiB
Town permits and filings for parcel 049-002-00 (searched 2026-10-08)
Where the Town keeps them: everything since about 2020 is in the OpenGov permitting portal (https://willingtonct.portal.opengov.com, public "Search for public records"); the Town says historic permits were loaded there too. The parcel is location 29471, listed as "0 POTTER SCHOOL RD" (owner Willington Developers Ltd Ptnship, 89 State St, Guilford); it is not among the first ten hits for "Potter School Rd", search "0 POTTER" instead. AxisGIS property files for the parcel hold only the standard cards. 2025-2026 IWWC and PZC minutes (AgendaCenter) and the 2021 minutes archived on the Wayback Machine do not mention the parcel.
What is on file: two records, both from the 2022 timber harvest
| Record | Type | Created | Status | Issued |
|---|---|---|---|---|
| TH-22-4 (portal record 14421) | Timber Harvest, Forest Practices Regulations | 2022-09-20 | Complete | Timber Harvest Permit issued 2022-11-15 |
| IW-22-12 (record 14572) | Jurisdictional Ruling (IWWC), agricultural "permitted use as of right" | 2022-10-21 | Complete | Inland Wetlands Permit issued 2022-10-25 (th-22-4/IW-22-12-permit-print.pdf) |
No building permit, certificate of zoning compliance, zoning permit, subdivision, septic or driveway record is attached to the location. Nothing from the 1980s pond construction is in the portal; DEEP Dam Safety (2026-10-08) thinks the Town may have permitted it and is asking the Town; our FOIA draft asks the same.
TH-22-4 in brief (files in th-22-4/)
- Applicant and operator: Anthony J. Grossi, Grossi Forest Products, 18 Butterworth Rd, Holland MA, certified supervising forest products harvester SFPH21; second practitioner Philip Misiaszek (Knox Trail Rd). Forester John Clarke, cert. F000982, drew the map and the plans. Landowner contact on the IW form: rwaldo7735@aol.com, 203-453-4386 (Guilford).
- Operating area 74 ac of the 91.2 (IW form). Thinning: 169 MBF sawtimber (mixed hardwoods and white pine) plus 278 cords firewood (251 cords on the IW form), 9 to 12 weeks from late Sept / 1 Nov 2022. Feller buncher, two grapple skidders, loader with slasher and delimber; whole trees pulled to the landing; 3 to 5 operators, ~7 ac/week. Trucks turn into the landing from Fenton Bluffs Drive; landing stabilised with stone at the blacktop approach.
- Silviculture (
silvicultural-plan.pdf): Stand 1 oak-hardwoods, ~100 years old, shelterwood preparation cut removing 60 sq ft basal area, follow-up overstory removal "in 12-17 years". Stand 2 white pine-hardwoods, uneven aged, irregular shelterwood. Cut trees: oak, maple, birch, pine over 16 in DBH, plus cordwood under 12 in; scattered big trees kept. Buffers: no cutting within 15 ft of boundaries, 50 ft of streams, 10 ft of roads; variable around ponds and wetlands. Gypsy moth mortality noted but "not extensive". No forest management plan on file. - Map (
forest-map.pdf, hand drawn 9/22, 1 in = 375 ft): stone walls, proposed trails, soil type lines (lodgement till on the ridges, melt-out till in the valley), the landing at the Fenton Bluffs cul-de-sac, two poled stream crossings SC-1 and SC-2 on the brook in the south-west, a "beaver pond" (the 3-ac pond) and a small wetland. Note the forester labels the pond a beaver pond; the lidar embankment and the 1986 aerial say it was dug. grossi-crossings.docx(8 photos, contact sheetcrossings-contact.jpg): the two crossing sites before work, rocky intermittent brook, orange flagging.- Abutters notified by certified mail 2022-10-06 (
abutters.pdf,cert-mail-slips.pdf): 44/001-00 Parizek, 44/003-00 Robbins-Pianka, 44/005-0A Woolf, 44/05A-04 73 Balazs Rd land trust, 49/002-05 to -09 Balazs Rd houses, 49/002-0B Balazs, 49/002-14, -16, -17, -20, -21, -23, -24 (43 Potter School, then Ross), -54 (45 Potter School, then Tolley). Legal notice ran in the Hartford Courant 2022-10-28 (affidavit filed as "TH224 PZ2216"). - IW-22-12 permit: standard ten conditions only, no additional conditions, expiry left blank on the permit (the form says 12/31/2023). Conditions include notifying the agent on start and finish and 7 days before clearing in a regulated area; no fill or debris in wetlands; poled crossings to be removed after harvest (operational plan).
What this means for the purchase
- The logging was permitted and closed out as "Complete"; no enforcement record is attached. Ask the Land Use office whether the completion notice (§ 300-6E(4)) and post-harvest stabilisation inspection (§ 300-3J) were recorded, and whether the corduroy was pulled from the two crossings.
- The silviculture plan commits nothing, but it describes the stand you are buying: a 2022 shelterwood prep cut with the overstory removal due 2034-2039 if a future owner wants it, and advanced regeneration 20-40 ft tall in the pine stand. Firewood volume (278 cords) suggests heavy removal of small stems along trails.
- The TH-22-4 permit (issued 2022-11-15, "Selective Timber Harvest", additional condition: per DEEP BMPs and the submitted plans) is saved as
th-22-4/TH-22-4-permit.htmland.txt; the IW-22-12 permit asth-22-4/IW-22-12-permit-print.pdfand.txt. - Still outstanding from the Town: anything on the 1980s pond, building/zoning history, and the Fenton Bluffs subdivision file (FOIA draft to mdamato@willingtonct.gov).
Trails and crossings as map geometry (2026-10-08)
The forester's proposed trails, the two poled stream crossings and the landing are georeferenced in
th-22-4/harvest-trails.geojson (WGS84 + z) and th-22-4/harvest-trails-6433.geojson (viewer CRS); method and
caveats in th-22-4/harvest-trails.md. Only the east haul road to the Fenton Bluffs cul-de-sac is visible in the
2023 ortho; the rest is the drawing as fitted (10-30 m). Draft Property Explorer layer th-22-4-harvest-trails
(id 3) is created and empty, waiting for an item API; tools/pe_push_trails.py holds the payload builder.