# TH-22-4 harvest trails and stream crossings as map geometry Built 2026-10-08 from the forester's hand-drawn map (`forest-map-north-up.png`, John Clarke 9/2022, 1" = 375') so the proposed skid trails, the two poled stream crossings and the landing can be pushed into the Property Explorer viewer as draped lines and points once an item-writing interface exists (the MCP only creates empty layers today; an empty draft layer "TH-22-4 harvest trails" has been created to receive them). Files - `harvest-trails.geojson` — WGS84 lon/lat with z (m NAVD88) on every vertex. Lines are Catmull-Rom splines through the digitised control vertices, sampled every 5 m; z is bilinear from the CT 2023 lidar DEM at 2 ft. - `harvest-trails-6433.geojson` — the same in EPSG:6433 (NAD83(2011) CT state plane, metres), the viewer's CRS. Each line feature keeps its `control_vertices` so the spline can be rebuilt or edited. - `harvest-trails-overlay-2023-ortho.jpg` — the result over the 2023 leaf-off ortho (2 ft/px) with the lidar-derived channels (cyan, upslope area over 1 ha) and the parcel. - `harvest-trails-corridor-2023-ortho-0.5ft.jpg` — the haul-road corridor at 6 in/px. - `dem-channels-2023-lidar.jpg` — the D8 flow-accumulation channels used to snap the crossings. - `fit-forest-map.py`, `build-harvest-trails.py` — the scripts (run from the scratchpad; they expect the CT ECO exports listed below next to them). Method 1. Georeference: 17 parcel corners read off the drawing (pixels of the 2200x1700 north-up scan) were matched to GIS parcel vertices (`boundary.geojson`). A plain affine fits with mean 8.4 m / max 32 m residual (scale 0.574 m/px, rotation 0.4 deg); the drawing is hand-sketched and locally compressed, so a thin-plate spline through the same points was used to warp the trails. 2. Digitise: the "Proposed Trail" dashes were traced as four lines: `A-west-spine` (NW corner to the central junction), `A-east-haul-road` (junction to SC-1 and the landing), `B-centre` (junction south across SC-2 to the south trail) and `C-south` (east-west below the pond). Label leaders and stand-type lines were ignored. 3. Check against imagery: CT ECO 2023 leaf-off ortho at 0.25 ft native (exported at 1 ft and 0.5 ft) and the 2023 lidar hillshade. Only one feature is visible: a pale corridor running east along about 274758 N from 348100 E to the brook at 348378 E, continuing to the Fenton Bluffs cul-de-sac. The forester's east trail was moved onto it; the part west of his junction is kept as a separate `corridor-west-stub`. No other trail is visible, so the spine, the centre trail and the south trail are the drawing as fitted (expect 10-30 m error). The flight date of the ortho relative to the Nov 2022-Feb 2023 cutting window is not known; the woods show no obvious fresh landings or slash, so it may predate the job. 4. Stream crossings: the USGS NHD has neither brook. Channels were derived from the 2 ft DEM (pysheds D8). SC-1 was snapped to the eastern brook (20 ha upslope) where the corridor crosses it, at 348378 E 274758 N, elevation 220 m; SC-2 to the pond-outlet brook (11 ha) at 348133 E 274390 N, 258 m. The landing is placed inside the parcel at the cul-de-sac, 348430 E 274748 N. Lengths: spine 493 m, east haul road 287 m, corridor stub 135 m, centre 428 m, south 384 m (about 1.7 km of trail; the spine climbs from 249 to 284 m). Inputs not kept in the repo (re-export from CT ECO ImageServer if needed) - Ortho_2023_CTspNAD83_2011 exportImage, bbox 1140746,899437,1143370,903046 (EPSG:6434 ft), 2624x3609 (1 ft) and two 5248x3610 halves (0.5 ft). - Statewide2023_CTspNAD83_2011 (DEM) exportImage, same bbox, 1312x1805 F32 tiff (2 ft). Push format (pending the viewer's item API): one item per feature, geometry in EPSG:6433 metres, `kind` = skid-trail | stream-crossing | landing, `label`, `basis`, draped on the terrain (z is supplied but the viewer's own DEM should win). See `tools/pe_push_trails.py`.