Commit graph

7 commits

Author SHA1 Message Date
acamilo
0ace07c57c Merge main: the bus slice, whose write-gate fix removes the flybus teardown flake under parallel load 2026-09-22 13:17:30 +00:00
acamilo
574e9fec0c Merge feat/sf-contract-01 at f043cd7: packages/session-types, the canonical number rule and the seed/envelope specifications 2026-09-22 13:03:56 +00:00
acamilo
0d098ee408 session: both transports for every integration test, and the mid-step pause written into step-v1
Review found two Memory-only tests behind a README claim that every integration test runs
twice. Both are now generated by both_transports!: the one-agent composition, and the
old-epoch refusal, which is one of the three tests the old-worker-replies row cites. The
README says which single test walks both transports inside itself instead, because it
compares their traces against each other.

step-v1 section 2 gains the mid-step pause line and a dated amendment saying why it is not
a new edge: a pause requested during a transition is the ordinary
Committing(k) -> Ready(k+1) edge followed by Ready(k+1) -> Paused(k+1), because section 6
requires the transition to finish first, so the only boundary such a pause can land on is
the one the transition just committed.
2026-09-22 13:00:14 +00:00
acamilo
f043cd79c0 docs(session-framework): seed derivation v1 and the FLYSESS1 checkpoint envelope
Two specifications CONTRACT-01 owes the slices that cannot be built without them.

seed-derivation-v1: the versioned derivation of independent per-agent seeds from a recorded
master seed and stable agent ids, the exact hashed material, the lane rule that keeps a seed
away from zero (the pinned kernel RNG is an xorshift, whose state must not be zero), the
properties a composition may rely on, and the test vectors both languages reproduce.

checkpoint-envelope-v1: the exact byte layout of the new envelope per state-media-v1 section
4, with the header, canonical-JSON manifest, 112-byte payload table entries, eight-byte
aligned payloads and the digest footer; the manifest field set; what a reader enforces and in
what order; and the durable commit sequence of section 6, whose commit point is the store
manifest rename. FLYSIM01 is unchanged, refused at the magic, and stays separately readable.

Both are specifications with fixtures, not the store: generations, rotation, the capture
queue and the restore flow remain STATE-01.
2026-09-22 12:47:48 +00:00
acamilo
c3bda90b82 test(flybus): prove the two section 9 rows a review found cited but unproven
An independent review of 4f44894 accepted the audit with two required evidence
changes, neither of which needed a code change.

"Classification is not a topic-name heuristic" cited a lane-order test that
never varies a topic name. The row is now conforms-by-construction, naming the
four scheduler functions that read only the queue an item sits in, and
a_topic_named_like_a_notice_is_still_classified_as_topic_data publishes on
topics called call.failed, route.removed and subscription.closed and asserts
each arrives as a topic.message delivery with its payload intact.

"A latest subscriber never causes BACKPRESSURE" cited a bounded-mode test and
the ignored measurement. a_latest_subscriber_never_refuses_a_publication floods
one unconsumed latest slot with 100 publications of 60 KB, six times the
per-client bounded byte pool, and asserts none is refused, 98 coalesce, the
queue stays at one and the credit never comes back. That row also underwrites
the byte-budget deviation and the first contradiction.

Both tests run over both transports.

The coordinator resolved both contradictions in the spec rather than the code,
so bus-v1 carries them as dated amendments with one line of reason each: the
section 9 table row becomes "Per-client ordinary bounded queued envelope bytes"
with a new "Latest subscription slots | subscriptions x 64 KiB" row, and the
section 2 sketch drops the budget argument and shows the deadline at the caller.
With the amended wording the byte-budget row conforms, so the report's counts
are 178 / 9 / 1 fixed / 7, and the crate README's differences 4 and 8 say they
no longer differ.
2026-09-22 12:39:07 +00:00
acamilo
4f44894ede docs(design): a bus-v1 conformance report, and the amendments it asks for
bus-conformance.md audits the flybus crate against bus-v1 sections 2 to 11, one
row per normative sentence: requirement, status, code location, the test that
proves it. 195 rows, 177 conforming, 10 deviating with the sentence that allows
each, 1 must-fix (the teardown starvation, fixed in this branch) and 7 not
implemented with an owner named. It also maps every BUS-01/02/03 acceptance
bullet to its test, reconciles all ten of the crate's own differences from the
draft, records the frame measurement with the reasons it is not a capacity
claim, and lists the two contradictions inside the draft it will not guess at:
the per-client queued byte budget against the latest-mode guarantee, and
section 2's call budget against section 6's client-owned deadline. Neither
changed any code.

bus-v1 gains section 12: dated amendments for the three error codes the
implementation needs and the draft left unnamed (CONFLICT, NO_TOPIC,
ARTIFACT_MISMATCH), one line of reason each, and for the one operation it adds
(rpc.responder.release), which is how bounded call correlation ends when a
handler keeps reply authority after releasing the request delivery. Section 9's
error list is inclusive, and section 4 already provides for a digest change.

The crate README points at the report, carries the new measurement summary in
place of the old numbers, and describes the two new test files; the design index
and the flybus index point at the report too.
2026-09-22 12:07:11 +00:00
acamilo
05e93a95ef docs(design): session-framework specs (bus-v1, ipc-v1, step-v1, workers-v1, publishing-v1, state-media-v1) and the MaleCNS modular-session plans
Some checks failed
ci / node 22 (test + typecheck) (push) Has been cancelled
ci / rust stable (cargo test --workspace --release) (push) Has been cancelled
ci / infra/tests/lint.sh (push) Has been cancelled
ci / playwright apps/stage (allowed to fail) (push) Has been cancelled
2026-09-22 11:01:55 +00:00